Due to the closure of the Toronto bound lanes of the Skyway Bridge, the Burlington lift bridge will be operating at a reduced schedule. The bridge will be lifting every hour on the hour until further notice.
![](https://www.harbourwest.ca/wp-content/uploads/2014/08/1960-Sailing-Under-the-new-Skyway-Bridge.jpg)
Due to the closure of the Toronto bound lanes of the Skyway Bridge, the Burlington lift bridge will be operating at a reduced schedule. The bridge will be lifting every hour on the hour until further notice.