Marina update, directly from Jordan Kropf.

  • HVAC still to check the design for the dryer venting; once checked, it’ll be installed. The doors will be trimmed/adjusted at the same time the crew is on site for the dryer venting system.
  • There are two fire pedestals remaining to be installed on B docks.
  • The urinal flush valve issue is pressure related. Contractor and consultant met on site today to arrange testing of the system. Still on our way to solving the issue; patience is appreciated.

Breakwater update, after speaking with Ausenco (City’s engineer)

  • Ausenco report expected Monday or Tuesday.
  • No news from MGB Claims or from Riggs insurer, XL Catlin.
  • Ken still maintains that his intention is to bring the north breakwater up as soon as possible after the reports and recommendations are completed.